Urban storage providing peak shaving and resilience for a dense metropolitan network, sited on brownfield industrial land with existing connection capacity.

Capacity

25 MWh

Development stage

Construction-ready

Location

Tel Aviv Metro, Israel

Timeline

Construction Q1 2027 — COD Q3 2027

Total capex

USD 18m

Turnkey

Target equity IRR

13.7%

Contracted services

Peak demand cut

12.5 MW

Local network relief

Build period

9 months

Modular delivery

Investment opportunity — Institutional debt & equity · USD 18m

Schedule an investment meeting

Project gallery

Drone photography & site views

Storage yard at dusk
Storage yard at dusk
Container rows and cooling
Container rows and cooling
Power conversion system
Power conversion system
Controls commissioning
Controls commissioning

Technical specifications

Engineered to bankable standards

Energy capacity

25 MWh

Power rating

12.5 MW

Duration

2 hours

Footprint

4,100 m²

Grid connection

22 kV, existing

Response time

< 200 ms

Israel

Tel Aviv Metro, Israel

Grid connection · 22 kV, existing

Construction timeline

Project lifecycle

  1. 2025

    Site secured

  2. 2026

    Permitting complete

  3. 2027

    Construction & COD