Tel Aviv Storage Hub
Urban storage providing peak shaving and resilience for a dense metropolitan network, sited on brownfield industrial land with existing connection capacity.
Capacity
25 MWh
Development stage
Construction-ready
Location
Tel Aviv Metro, Israel
Timeline
Construction Q1 2027 — COD Q3 2027
Total capex
USD 18m
Turnkey
Target equity IRR
13.7%
Contracted services
Peak demand cut
12.5 MW
Local network relief
Build period
9 months
Modular delivery
Investment opportunity — Institutional debt & equity · USD 18m
Schedule an investment meetingProject gallery
Drone photography & site views




Technical specifications
Engineered to bankable standards
Energy capacity
25 MWh
Power rating
12.5 MW
Duration
2 hours
Footprint
4,100 m²
Grid connection
22 kV, existing
Response time
< 200 ms
Israel
Tel Aviv Metro, Israel
Downloads
Construction timeline
Project lifecycle
2025
Site secured
2026
Permitting complete
2027
Construction & COD