Novi Sad Solar Park — Utility Scale project in Serbia
All projects
SerbiaUtility ScalePipeline

Novi Sad Solar Park

Utility-scale generation adjacent to a strong 110 kV node serving the Novi Sad industrial belt, with land and permitting advanced and an optional 30 MWh storage phase.

Capacity

72 MWp

Development stage

Late-stage development

Location

Novi Sad, Serbia

Timeline

Construction Q3 2027 — COD Q2 2029

Total capex

EUR 46m

Including grid works

Target equity IRR

11.8%

Base case

JV structure

50 / 50

Development carry retained

Offtake horizon

12 years

Utility PPA under discussion

Investment opportunity — Joint venture · EUR 46m

Schedule an investment meeting

Project gallery

Drone photography & site views

Early works on the eastern parcel
Early works on the eastern parcel
Completed reference array
Completed reference array
Site engineering review
Site engineering review
Grid corridor
Grid corridor

Technical specifications

Engineered to bankable standards

Installed capacity

72 MWp / 60 MWac

Annual yield

101 GWh

Storage option

30 MWh, 2h duration

Grid connection

110 kV, in process

Land

112 ha secured

CO₂ avoided

57,000 t / year

Serbia

Novi Sad, Serbia

Grid connection · 110 kV, in process

Construction timeline

Project lifecycle

  1. 2025

    Site identification & land options

  2. 2026

    Grid study submitted

  3. 2027

    Permits & construction start

  4. 2029

    Commercial operation