SEE Pumped-Storage & Hybrid Complex — Hydropower project in Serbia
All projects
SerbiaHydropowerPipeline

SEE Pumped-Storage & Hybrid Complex

A long-duration energy storage complex pairing pumped-storage hydro with co-located solar and battery capacity, designed to balance a rapidly growing regional renewable build-out.

Capacity

220 MW / 1.8 GWh

Development stage

Origination

Location

Southeast Europe

Timeline

Feasibility 2026 — COD 2032

Long duration

8 h

Full-power discharge

Hybrid

Hydro + PV + BESS

Single connection

Investment

EUR 620m

Total complex

Grid value

Firm capacity

Regional balancing

Investment opportunity — Strategic partnership · EUR 310m

Schedule an investment meeting

Project gallery

Drone photography & site views

Upper reservoir and penstock alignment
Upper reservoir and penstock alignment
Lower reservoir and powerhouse location
Lower reservoir and powerhouse location
Co-located battery storage compound
Co-located battery storage compound

Technical specifications

Engineered to bankable standards

Turbine capacity

220 MW reversible

Storage duration

8 hours / 1.8 GWh

Co-located solar

90 MWp

Co-located BESS

60 MW / 120 MWh

Round-trip efficiency

79%

Grid connection

400 kV transmission

Asset life

60+ years

Offtake

Capacity market + arbitrage

Serbia

Southeast Europe

Grid connection · 400 kV transmission

Construction timeline

Project lifecycle

  1. 2026

    Site & feasibility studies

  2. 2028

    Permitting & EIA

  3. 2029

    Financial close

  4. 2032

    Commercial operation