Ashdod Logistics Rooftop
A port-adjacent logistics rooftop delivering clean generation directly into a 24/7 cold-chain and distribution operation.
Capacity
4.2 MWp
Development stage
Operational
Location
Ashdod, Israel
Timeline
Delivered in 6 months — COD 2025
Energy cost cut
26%
Annualised
Payback
5.1 years
Achieved
Availability
99.4%
Since energisation
O&M
15 years
Full scope
Investment opportunity — Operating asset · yield co-investment
Schedule an investment meetingProject gallery
Drone photography & site views




Technical specifications
Engineered to bankable standards
Installed capacity
4.2 MWp
Annual yield
6.4 GWh
Self-consumption
78%
Roof area
24,600 m²
Structure
Ballasted aluminium
CO₂ avoided
3,600 t / year
Israel
Ashdod, Israel
Downloads
Construction timeline
Project lifecycle
2024
Design & permits
2025
Construction
2025
Commercial operation