Ashdod Logistics Rooftop — Commercial project in Israel
All projects
IsraelCommercialCompleted

Ashdod Logistics Rooftop

A port-adjacent logistics rooftop delivering clean generation directly into a 24/7 cold-chain and distribution operation.

Capacity

4.2 MWp

Development stage

Operational

Location

Ashdod, Israel

Timeline

Delivered in 6 months — COD 2025

Energy cost cut

26%

Annualised

Payback

5.1 years

Achieved

Availability

99.4%

Since energisation

O&M

15 years

Full scope

Investment opportunity — Operating asset · yield co-investment

Schedule an investment meeting

Project gallery

Drone photography & site views

Rooftop array over the distribution hub
Rooftop array over the distribution hub
Loading bays below the array
Loading bays below the array
Installation detail
Installation detail
Site team
Site team

Technical specifications

Engineered to bankable standards

Installed capacity

4.2 MWp

Annual yield

6.4 GWh

Self-consumption

78%

Roof area

24,600 m²

Structure

Ballasted aluminium

CO₂ avoided

3,600 t / year

Israel

Ashdod, Israel

Grid connection · Secured

Construction timeline

Project lifecycle

  1. 2024

    Design & permits

  2. 2025

    Construction

  3. 2025

    Commercial operation